SITE HISTORY: Timber treatment yard
LOCATION: Middlesex
PRIMARY CONTAMINANTS: Creosote
DESCRIPTION OF WORKS:
Rerouting and decontamination of a riverbed.
Construction of new riverbed
Installation of a permanent funnel and gate groundwater treatment system.
On-site Bioremediation of 2000m3 of impacted soils.
Mobile water treatment plant for dewatering excavations
Long term environmental monitoring of the site
SITE HISTORY: Scrap Yard and Landfill site
LOCATION: Warwickshire
PRIMARY CONTAMINANTS: Japanese Knotweed, Hydrocarbons, Heavy Metals and
Asbestos
DESCRIPTION OF WORKS:
Excavation and disposal to licensed facilities of 27,000m3 of
impacted soils.
Excavation, over-drumming and disposal of 30 buried chemical drums.
Backfill with locally sourced clean and suitable materials
Installation of an impermeable underground cut-off wall
Mobile water treatment plant for dewatering excavations
Construction of habitat area and cycleway
SITE HISTORY: Plastic packaging factory
LOCATION: Dorset
PRIMARY CONTAMINANTS: Solvents and Asbestos
DESCRIPTION OF WORKS:
Demolition of 6 existing factory buildings
Construction of sheet pile walls around the perimeter of the site to prevent
subsidence at adjacent properties.
Excavation of 26,000m3 of soils. On site screening procedures led
to the disposal of 10,000m3 of material at licensed facilities.
Mobile water treatment plant for dewatering excavations
SITE HISTORY: Paint factory / Landfill
LOCATION: East London
PRIMARY CONTAMINANTS: Solvents
DESCRIPTION OF WORKS:
excavation and disposal of 4000m3 of contaminated soil
24 hour mobile water treatment plant for dewatering excavations
SITE HISTORY: Foundry / Landfill
LOCATION: Kent
PRIMARY CONTAMINANTS: Cyanide and Hydrocarbons
DESCRIPTION OF WORKS
Excavation and disposal of 1000m3 of hydrocarbon contaminated
soils
Excavation and disposal of 500m3 of cyanide contaminated soils
Encapsulation of landfill and construction of venting system
Mobile water treatment plant for dewatering excavations
SITE HISTORY: Gas Works
LOCATION: Cambridgeshire
PRIMARY CONTAMINANTS: Hydrocarbons and Cyanide
DESCRIPTION OF WORKS
Complete remediation of entire site
Mobile water treatment plant for dewatering excavations and underground structures
SITE HISTORY: Clothing Factory
LOCATION: Central Scotland
PRIMARY CONTAMINANT: Diesel fuel
DESCRIPTION OF WORKS:
Excavation and disposal of 500m3 of impacted materials.
Reinstatement of the affected area.
Mobile water treatment plant for dewatering excavations
SITE HISTORY: Used Oil Processing Plant
LOCATION: East Sussex
PRIMARY CONTAMINANT: Acid Tar
DESCRIPTION OF WORKS
Excavation and offsite disposal of 1000m3 of special waste
SITE HISTORY: Mill and Plant Storage Yard
LOCATION: County Down
PRIMARY CONTAMINANT: Diesel fuel and engine oils
DESCRIPTION OF WORKS:
Excavation and Bioremediation of 2000m3 of impacted soils
Addition of nutrients, compost and bacterial cultures to soil to accelerate
bioremediation
Mobile water treatment plant for dewatering excavations and treating leachate